The container glass manufacturer placed the order with Zippe Industrieanlagen GmbH for a batch plant with a max. capacity of 400 t/d.
It is part of an order to install a fully automatic cullet return system for the new furnace F#3 in Porto Ferreira, Brazil.
Apart from the equipment and the complete control system, the steelwork is also part of the scope of supply.
The plant should be commissioned in the 2nd quarter of 2014.